Tag

Metals

Granville Bridge Abutment Repairs

/
The project is a seismic upgrade to the bridge utilizing post-tensioned Dywidag bars and concrete modifications.

2021 Bridge Rehabilitation

/
The project is to maintain and rehabilitate the existing bridge structures.

Aldergrove WTP Tank Replacement

/ /
This project will involve a 3-month shut down of the plant to facilitate the replacement of 2 creation tasks and 3 filtration tanks with 2 new Gravity filter tanks.

16 Avenue – 2440 Block Culvert Upgrade

/ /
The project scope involves upgrades to the unnamed tributary to Little Campbell River culvert crossing located at the 24400 block of 16 Avenue.
1 2 3
  • Search by Division

  • Search by Location

  • Search by Project Scope