Bridgeway Slope Rehabilitation

ClientCity of Vancouver
LocationTrans Canada Trail, Vancouver , BC
Year2021
ConsultantThurber Engineering Ltd.

About the Project

11

This project aims to address immediate slope stability concerns related to a section of the Trans Canada Trail under the Second Narrows Bridge. 

Scope of Work

– Disposal of existing timber half-structure
– Drilling and installation of a new soldier pile wall
– Precast ballast wall
– Low density concrete backfill and paving