Bridgeway Slope Rehabilitation

Vancouver, BC

Project Info

This project addressed immediate slope stability concerns related to a section of the Trans Canada Trail under the Second Narrows Bridge. The project involved the deconstruction and disposal of the existing timber half-structure and associated waste material and construction of a new soldier pile wall with concrete lagging , precast roadside barriers and fencing.

Scope of Work

  • Demolition
  • Excavation
  • Pile driving
  • Slope stabilization
  • Paving
  • CONTRACT VALUE$925,989
  • CLIENT
  • CONSULTANTThurber Engineering Ltd.
  • TIMELINEOctober 2021