Cableway Decomissioning Beaver River

Golden, BC

Project Info

Environment and Climate Change Canada (ECCC) maintains cableway and hydrometric gauging stations across approximately 500 sites in the Pacific and Yukon areas. The hydrometric data support activities such as policy development, infrastructure design, water allocation, flood and drought response, recreation, navigation, ecosystem protection, and scientific study. Hydrometric stations typically consist of a “walk-in” or “look-in” instrument shelter and a cableway or metering bridge to measure discharge. 

The removed cableway spanned approximately 67m across Beaver River.

Scope of Work

  • Cableway decommissioning
  • Removal of all cables and cable hardware
  • Removal of A-frames
  • Removal of the cable car
  • CONTRACT VALUE$40,000
  • CLIENT
  • CONSULTANTDefence Construction Canada
  • TIMELINEMay 2021 - June 2021