Murray Road Beach Access

ClientDistrict of Sooke
LocationCity of Sooke, BC
Year2018
ConsultantHerold Engineering

About the Project

11

Luxton Construction was awarded the Murray Road Beach Access project. The project started in April 2018 and was completed in June 2018.

Scope of Work

• Piling
• Concrete Works
• Heavy Timber Structure
• Cedar Decking
• Rough Terrain
• Landscaping
 

Luxton Construction

Building a better future