Pepin Creek Culvert Rehabilitation

Abbotsford, BC

Project Info

The project involved installation of 19m 750 mm ø HDPE culvert to replace existing 450 mm ø CSP culvert via open-cut construction; Installation of two 19m 1050 mm ø SRPE BOSS 3000 culverts via open-cut construction; Installation of approximately 10m3 of Class 10kg riprap, 42m3 of Class 100kg riprap, 20m3 of Class 250kg riprap, and 120m2 of geotextile; Implementation of traffic management plan and single lane/full road closure during construction; and various removals, pavement and site restoration activities.

Scope of Work

  • In-stream Work
  • Fish Salvage
  • Sheet Pile Cofferdams
  • Stream Bypass
  • Earthworks
  • Culvert Rehabilitations
  • Rip Rap
  • AC Paving
  • CONTRACT VALUE$350,000
  • CLIENT
  • CONSULTANTOnsite Engineering
  • TIMELINESeptember 2020 - September 2020