Water Ingress at Section One Stairwell

Esquimalt, BC

Project Info

Luxton Construction was awarded the Water Ingress at Section One Stairwell project. The project involved the repair of concrete cracks and joints in the main filling and dewatering tunnel at the Esquimalt Graving Dock.

Scope of Work

  • Confined Space
  • Concrete Demolition
  • Concrete Repair
  • Grouting
  • Waterproofing
  • Bypass Pumping
  • Environmentally Sensitive
  • CONTRACT VALUE$400,000
  • CLIENT
  • CONSULTANTHerold Engineering
  • TIMELINEJune 2019 - September 2019