1 604 676 0065 Mon - Fri 07:30 - 16:30 8275 92 St Unit 103A, Delta, BC V4G 0A4

Tag

Concrete
11

Bridge Rehabilitation Program

/
The project is to maintain and rehabilitate the existing bridge structures.

Demoltion of Existing Slab and Re-paving Fraser Port of Entry

/ /
The project is an upgrade to the existing inspection canopy, re-paving, and addition of pedestrian walkways.
11
11

Granville Bridge Abutment Repairs

/
The project is a seismic upgrade to the bridge utilizing post-tensioned Dywidag bars and concrete modifications.

B3 Patio and BBQ Shelter

/
The project involves construction, servicing, and furnishing of a new covered BBQ shelter, including electrical and mechanical trenching for the installation of power, gas, water, and storm main services.
11
11

Fabricate and Install New Metal Stairs

/ /
Luxton was awarded the exterior upgrades project at the Little Gold Border crossing on the famous "top of the world" highway between Alaska and the Yukon Territory.

Barracks B24 and B25 Renovations

/ / /
Luxton Construction was awarded the Barracks B24 and B25 Renovations in Comox, BC.
11
11

SS Tower Construction at Naden N-92

/ / /
Luxton Construction was awarded the SS tower construction at Naden N-92.

CBSA Aldergrove Crossing Canopy Assessment and Repair

/ / /
Luxton Construction was awarded the CBSA Aldergrove Crossing Canopy Assessment and Repair Project.
11
11

Rappel Tower Construction

/ /
Luxton Construction was awarded the Rappel Tower Construction project by Defense Construction Canada. The project started in September 2020 and was completed in February 2021.

Mount Ozzard Bypass Road and Tower Foundation

/ / /
Luxton Construction was awarded the Mount Ozzard Bypass Road and Tower Foundation project. The project started in September 2020 and was completed in December of 2020.
11
1 2 3
  • Search by Division

  • Search by Location

  • Search by Project Scope