Projects

Bridge Rehabilitation Program

/
The project is to maintain and rehabilitate the existing bridge structures.

Aldergrove Water Treatment Plant Tank Replacement

/ /
This project will involve a 3-month shut down of the plant to facilitate the replacement of 2 creation tasks and […]

Fraser Point of Entry Demolition and Re-Paving

/ / /
The project is an upgrade to the existing inspection canopy, re-paving, and addition of pedestrian walkways.

Granville Bridge Abutment Repairs

/ /
The project is a seismic upgrade to the bridge utilizing post-tensioned Dywidag bars and concrete modifications.

B3 Patio and BBQ Shelter

/ / / / / /
The project involves construction, servicing, and furnishing of a new covered BBQ shelter, including electrical and mechanical trenching for the […]

Foundation Modifications

/ /
The project scope includes upgrading the existing pier foundations via a Micro pile and concrete solution around a busy CP […]

Culvert Upgrade

/
The project scope involves upgrades to the unnamed tributary to Little Campbell River culvert crossing located at the 24400 block […]

B224 Roof & Central Heating Replacement

/ / /
The project involves roof system demolition and replacement for the B224 roof & central heating plant.

Exterior Upgrades

/ /
Luxton was awarded the exterior upgrades project at the Little Gold Border crossing on the famous "top of the world" […]

Barracks B24 and B25 Renovations

/ / / / /
Luxton Construction was awarded the Barracks B24 and B25 Renovations in Comox, BC.

LED Crosswalk Signals

/ /
Luxton Construction was awarded the LED Crosswalk Signals project in Edmonton, AB.

New Westminster Pier Park Access

/ / / /
Construction work consists of building and installing at-grade rail crossing and related fencing at West Pier Park railway crossing located […]

SS Tower Construction at Naden N-92

/ / /
Luxton Construction was awarded the SS tower construction at Naden N-92.

Repair of View Deck – Bedford Landing

/ /
Luxton Construction was awarded the repair of the viewing deck - Bedford landing project by the Township of Langley.

Secondary Roads Brushing

/ /
Luxton Construction was awarded the secondary road brushing project by Parks Canada.

CBSA Aldergrove Crossing Canopy Assessment and Repair

/ / /
Luxton Construction was awarded the CBSA Aldergrove Crossing Canopy Assessment and Repair Project.

Rappel Tower Construction

/ / / /
Luxton Construction was awarded the Rappel Tower Construction project by Defense Construction Canada. The project started in September 2020 and […]

Mount Ozzard Bypass Road and Tower Foundation

/ / /
Luxton Construction was awarded the Mount Ozzard Bypass Road and Tower Foundation project. The project started in September 2020 and […]

Beaver Lake Environmental Enhancement

/ / /
Luxton Construction was awarded the Beaver Lake Environmental Enhancement project by the City of Vancouver. The project started in July […]

Kwisitis Visitors Centre Ucluelet

/ / / /
Luxton Construction was awarded the Kwisitis Visitors Centre Ucluelet project by Parks Canada. The project started in February 2020 and […]

Crabapple Lift Station

/ /
Luxton Construction was awarded the Crabapple Lift Station project by the Resort Municipality of Whistler. The project saturated in March […]

Davidson Ave Sewer Repair

/ / /
Luxton Construction was awarded the Davidson Ave Sewer Repair project by Defense Construction Canada. The project started in October 2020 […]

Cochrane Riverfront Park Bridge Replacement

/ / /
Luxton Construction was awarded the Cochrane Riverfront Park Bridge Replacement project. The project started in October 2020 and was completed […]

Rock Slope Stabilization-North Side

/ / /
Luxton Construction was awarded the Rock Slope Stabilization project in Victoria, BC.  The project was completed succesfully.

Bull Moose Creek Concrete Rehabilitation

/ /
Luxton Construction was awarded the Bull Moose Creek Concrete Rehabilitation project. The project started in July 2020 and was completed […]

Salt River Kitchen Construction

/ / / /
Luxton Construction was awarded the Salt River Kitchen Construction project by Parks Canada. The project started in July 2020 and […]

BGIS Shaft Access

/ /
Luxton Construction was awarded the BGIS Shaft Access project by Parks Canada. The project started in August 2020 and was […]

North Victoria Drive Outfall Rehab

/ / / /
Luxton Construction was awarded the North Victoria Drive Outfall Rehab project by the City of Vancouver. The project started in […]

Uyarsivik Lake Basecamp Improvement

/ / /
Luxton Construction was awarded the Uyarsivik Lake Basecamp Improvement project in Tuktuk Nogait National Park.

Ladner Perimeter Fence

/
The project consisted of fence erection, clearing, and grubbing.