Granville Bridge Abutment Repairs

ClientCity of Vancouver
LocationVancouver, BC
Year2021
ConsultantAssociated Engineering

About the Project

11

The project is a seismic upgrade to the bridge utilizing post-tensioned Dywidag bars and concrete modifications.

Scope of Work

– Concrete coring

– Supply and installation of anchor plates

– Hazardous material abatement

– Installation of post-tensioning Dywidag bars

– Concrete repairs and crack injection to corbels